For a deeper look into our Elektron API, look into:

Overview |  Quickstart |  Documentation |  Downloads |  Tutorials |  Articles

question

Upvotes
Accepted
53 0 0 10

what happens with UpdateType ClosingRun - rollover

How can I see the timings of the closing run process and how does that impact the pricing fids?

#productwebsocketsrrtostreaming-pricesclosing-run
icon clock
10 |1500

Up to 2 attachments (including images) can be used with a maximum of 512.0 KiB each and 1.0 MiB total.

@WLA01

Hi,

Please be informed that a reply has been verified as correct in answering the question, and marked as such.

Thanks,

AHS

1 Answer

· Write an Answer
Upvote
Accepted
53 0 0 10
  • the CLOSE/RUN timings for the different exchanges are documented in the Refinitiv Speedpages: <CLOSE/RUN1>RollOver LSEG.L.zip

rollover-lsegl.zip (4.0 KiB)
icon clock
10 |1500

Up to 2 attachments (including images) can be used with a maximum of 512.0 KiB each and 1.0 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 2 attachments (including images) can be used with a maximum of 512.0 KiB each and 1.0 MiB total.