How reiewRequired and reviewRequiredDate are used in world check one.
reviewRequired is a boolean .This Flag to indicate ReviewRequired after re-screening the CASE for this result.
reviewRequiredDate is a string(date-time). It's Represents the date andtime when this Result was last flagged for review.
Hi @saha.shilpi1
So, how are these used?
Hi@John
The ongoingscreening system is the only way those fields can be set.
If OGSdetects that the profile (either WC or Watchlist) of a pre-existing match hasbeen updated after the match was originally added to the case, it will setreviewRequired to true and reviewRequiredDate to the time when the OGS runhappened .
how is reviewRequired set to false after set to true by the OGS?